Client has retained Stelic LLC to aid the project team in developing and maintaining the Project Schedule . The scope involves the design and installation of new, High Bay structure with a fully integrated fire alarm and mass notification system (MNS) devices, connected to the existing building fire alarm system. The work includes a new internal structure, architectural finishes, system wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, initiating devices, notification appliances, and other accessories.

Building 40 High Bay 05 Modernizations
Federal / National Government
Client was awarded the Building 40 High Bay 05 Modernizations (NWIC) Pacific at Topside Complex Project at Naval Base Point Loma CA by NAVFAC Southwest in San Diego, CA.